Ships in 24–48 hours — order by 11 AM ET. Tracked shipping across Canada. No Minimums — no setup fees ever. Free Shipping on transfer orders $275 and up.
Guide · Turnaround

Order So You Never Miss a Deadline

Almost every late order comes from the same mistake: counting forwards from today instead of backwards from the date. DTF ships in 24–48 hours. The courier takes one to five business days. The revision you have not discovered yet takes two. Add those honestly and deadlines stop being stressful.
The formula

Three numbers, added backwards.

Read it right to left. The order date is what falls out of the sum — you do not choose it, the deadline does. Plan on the far end of the shipping window: day two for DTF, day three if the order includes UV DTF.

Business days matter more than people expect. With a four-day transit and no spare days at all, a Friday press date means a DTF order goes in by the previous Friday — a full week ahead, because the weekend eats two days that never appear in a courier estimate.

By province

How much lead time you actually need.

Transit from Ontario, measured from the day the parcel leaves. These are the conservative estimates we plan against rather than best-case figures.
Recommended lead time for DTF, including up to two business days to ship and two spare days. Add one business day if the order includes UV DTF.
Where you areTransitOrder this far before your press date
Ontario and Québec1–2 business daysAbout 6 business days
Manitoba and Saskatchewan2–3 business daysAbout 7 business days
Atlantic Canada2–3 business daysAbout 7 business days
Alberta3–4 business daysAbout 8 business days
British Columbia4–5 business daysAbout 9 business days
Vancouver Island and the north4–6 business daysAbout two weeks, and more in winter
The two days everyone forgets

Not the printing. Not the courier.

The artwork day

A person checks every file before it prints. If something is wrong, that is a message to you and a wait for your answer — which is a day well spent, and a day nobody budgets. Get the file right first →

The delivery-attempt day

A closed dock, an empty office, a locked lobby. One missed attempt is a full day, and it is the most common single cause of a late arrival that had nothing to do with the shipment.

The count-change day

Volunteer numbers firm up late. Rosters change. Order the base run early and top up rather than holding the whole order until the number is final.

The press-test day

If this is a new garment or a new supplier, press one and wash it before you commit the run. That test is worth a day and occasionally saves the whole job. Pressing settings →

When the date is fixed

What to do when there is no room.

A wedding, a tournament, a product launch, a first day of school. The date does not care about a courier, so stop treating the order as something to optimise and treat it as something to get out of the way.

Order early and store the transfers

This is the whole trick, and it costs nothing. Transfers keep indefinitely stored flat, away from heat and sunlight — so ordering two weeks early has no downside beyond having them sooner. The only irreversible outcome is being a day late.

Press ahead of the date

If you have the garments, press them the week before. A pressed shirt in a box is finished work; a transfer in transit is a risk you are still carrying.

And tell us the date

Put it in the order notes. We cannot make a courier faster, but knowing a date is fixed changes how we treat a query on your artwork — and occasionally it means telling you honestly that the date will not work, while you can still do something about it.

Worked example

Shirts needed for a Saturday.

A club in Calgary needs sixty pressed shirts for a Saturday tournament. Alberta is three to four business days in transit. Counting backwards, with business days only:

Counting backwards from a Saturday tournament in Calgary, for an order of DTF transfers
StepDayWhy
TournamentSaturdayThe fixed date. Nothing moves it.
Press the shirtsWednesdaySixty shirts is an evening, not a morning.
Second spare dayTuesdayRoom for a late parcel before pressing.
First spare dayMondayAbsorbs a failed delivery attempt.
Transfers arrivePrevious Friday, at the latestFour business days in transit — Alberta from Ontario, conservatively.
Leaves the shopPrevious Monday, at the latestDay two — the far end of 24–48 hours.
Order placedThe Friday before that, before the cut-offThat Friday is day one. The answer.

Fifteen days, not two

The order goes in two weeks and a day ahead, and most of that is not printing. Up to two business days go to getting it out of the door; the rest is four days in transit, the two spare days and two weekends. With UV DTF in the order, which ships in 1–3 business days, it goes in one business day earlier — the Thursday. People are consistently surprised by this, order on the Monday of tournament week, and then discover the transfers could land the Monday after it.

The same job in Toronto

One to two business days of transit instead of three to four, so the same tournament needs a DTF order placed on the Tuesday of the week before — eleven days ahead rather than fifteen. That is the entire practical difference between ordering in Ontario and ordering from further west.

FAQ

Frequently asked questions

How far ahead should I order DTF transfers?
Plan on two business days for a DTF order to ship — the far end of our 24–48 hours, or three with UV DTF — plus your province’s transit window, plus two spare business days. In Ontario that is about six business days, a little over a week, before you need to press. In British Columbia, closer to two weeks.
Why two spare days and not one?
Because the thing that slips is almost never the printing. It is an artwork revision, a missed delivery attempt, or a count that changes. One spare day covers a courier hiccup; two covers a decision.
What if my date genuinely cannot move?
Then order two weeks out and press early. Transfers stored flat and out of sunlight keep indefinitely, so there is no penalty for having them a week sooner — and no recovery if they are a day late.
Should I order everything at once or in stages?
Order the base run early and top up later. There is no minimum, so a second order of twenty costs the same rate per square inch as the first hundred, and it means a late count change does not invalidate the whole order.
Does a bigger order need more lead time?
No. A DTF order ships in 24–48 hours whatever its size, so a large run needs the same lead time as a small one. What does add a business day is UV DTF: an order with any UV design in it ships in 1–3 business days. The order screen shows the exact ship-by date before you pay.
What is the single most common cause of a missed date?
Ordering after the cut-off on the last possible day. 11 AM ET is the line: a DTF order placed at two in the afternoon on a Thursday counts Friday as day one and ships by Monday rather than Friday — over a weekend, one lost hour costs three calendar days.

Order early. Transfers wait better than you do.

There is no cost to having them a week before you need them, and no recovery from having them a day after.

No minimums · Ship date shown before you pay · Printed in Ontario